What does the ₹2.5 lakh 2 BHK include?
Kitchen cabinets, a wardrobe in each bedroom, a TV unit, a shoe rack, vanities in both bathrooms, painting for the whole flat, light and switch changes, and a deep clean, all at the Basic level. Add anything else, or move any item up to Medium or Premium, in the estimate above.
Can I pay in EMIs?
Yes, through your bank. The usual routes are a top-up on your home loan, a home renovation loan or a personal loan, all offered by HDFC Bank, SBI and ICICI Bank. We give you the itemised quote and GST invoices the bank asks for, and your bank decides the amount and rate.
Can interiors be added to my home loan?
Usually not to the original loan, because banks lend on the flat’s agreement value, which doesn’t include interiors. Once you have a home loan, you can ask the same bank for a top-up, which is usually priced close to your home loan rate. Ask your bank what applies to you.
What’s the difference between Basic, Medium and Premium?
Basic items are built on site by our carpenters, which keeps the cost down. Medium items are modular units made in a factory, with cleaner edges, soft-close fittings and faster installation. Premium is modular too, with plywood boxes, acrylic or PU finishes, organisers and top-end hardware.
Can you build any style, like European or Japandi?
Yes. The style decides the look: mouldings for European, light wood for Japandi, jaali and brass for contemporary Indian. The level decides the materials underneath. We show you both in your 3D design before you pay anything.
Where do the style photos come from?
They’re inspiration photos from Unsplash photographers and studios, not homes we have built, and 3D renders are labelled as renders. As we complete homes in Gurugram, we’ll show them here with the owners’ permission.
Do I pay anything for the design?
No. The site visit, 3D design and itemised quote are free. Your first payment is the booking amount, and only after you approve the design and price.
Does the estimate on this page include GST?
No. The estimate is before GST so you can compare it with other quotes. Your final quote shows GST as a separate line.
What if you miss the handover date?
The handover date is written into your contract, along with what we owe you if we miss it for reasons in our control. Delays caused by changes you ask for, or by society restrictions, move the date by the time they add.